  • Power Control Room
  • Living Quarter
  • Transportable Building
  • Power Control Room
  • Living Quarter
  • Electrical Distribution Control
  • Medium Voltage Switchgear
  • Medium Voltage Motor Control Center
  • Low Voltage Switchgear
  • Low Voltage Motor Control Center
  • Generator Control Panel
  • Distribution Board
  • Mobile Substation
  • Architecture
  • Structural
  • Electrical
  • Heating, Ventilation and Air Conditioning
  • Automatic Air Supression
  • Switchgear and Motor Control
  • Temperature rise and short circuit calculation for partially type tested assembly (PTTA)
  • Short Circuit Calculation
  • Temperature Rise Calculation
  • Enginereed to customize for every unique requirement
  • Connection to an existing line up : transition section
  • Transportable Control Room Project List
  • Electrical Distribution Panel Project List
  • Transportable Office Waskita – Palembang

    CustomerPT Waskita Karya (Persero) Tbk
    End UserPT Waskita Karya (Persero) Tbk
    Equipment Manufacturer
    ScopeDesign, fabrication & testing of Prefabricated building, lighting & small power system, earthing, HVAC (Split System),
    Quantity: 1 (one) buildings – CKD (Completely Knocked Down) Systems
    Duration19 November 2016 – 19 January 2017
    IncotermFranco On Site – Proyek Tol Kayu Agung-Betung