running condition of the equipment inside E-House. An excessive amount of heat was released by the fully loaded ground frequency converter (GFC) during the test. Inside air temperature was still within acceptable limit during the test. Thank to the HVAC unit installed in the E-House. The end user, Pelindo II, that witnessing the test was very satisfied with the result of the test. Delivering the E-House with 20M x 9M x 4M in size into 6 shipping splits and integrating into single E-house at site are another challenge for PT.Mutipanel. The allowable load per square meter is limited during the integration at site. Also the working clearance. PT. Multipanel, together with Schneider Electric and Pelindo II, have made a detail planning for the site integration work.